Installation on gravel

Video Tutorial

Installation on gravel is an ideal solution for gardens, especially where substrate drainage is a problem. The installation is dry and is done by placing the X2 porcelain stoneware slabs on a uniform layer of gravel of at least 10 cm without using adhesives. 

PDF PEZZI SPECIALI

Four simple steps for correct installation

1. Prepare the substrate by carefully spreading gravel in a uniform way, at the same time trying to even out the ground.

2. Position the slab on a layer of gravel of at least 10 cm compacting them down with your hands.

3. Complete installation with light hammer blows.

4. The surface is now ready for use, for living in the open air in comfort and style.

Other installation systems

Installation on grass

X2 tiles can be installed dry on a grassy substrate to create high performance walkways and outdoor paving.

Discover an installation on grass

Installation on sub-floor

A glued installation on a sub-floor in combination with the X2 surfaces creates stable and resistant flooring in areas that require high technical performance

Discover an installation on sub-floor

Raised installation

A raised installation is the ideal solution for businesses that wish to pave an outdoor space.

Discover a raised installation

Ventilated facade

Ventilated façades are used to protect walls from the weather, improving the comfort of the home.

Discover a ventilated facades' installation

Trim pieces Italon X2

Having a great material for your floors may be not enough when you have realize your ideas to reality. For this reason Italon X2 offers you a wide range of special products for the design of public and residential spaces, swimming pools and green areas.
Download a PDF of trim pieces that complete Italon X2.

PDF TRIM PIECES