Installation on grass

Video Tutorial

X2 tiles can be installed dry on a grassy substrate to create highperformance walkways and outdoor paving. Laying X2 slabs on grass is extremely practical, fast, simple and economical. The absence of glue also makes it extremely versatile and allows subsequent modification.  

PDF PEZZI SPECIALI

Four simple steps for correct installation

1. After positioning the slab and once the perimeter has been traced, it is necessary to raise the surface from the grass substrate.

2. Dig down 5-6 cm deep inside the outlined shape of the slab.

3. Carefully spread fine gravel on the hollowed outline corresponding to the slab shape.

4. Finally, place the slab back into its original position, taking care that it is at least 1 cm below the level of the grass.

Other installation systems

Ventilated facade

Ventilated façades are used to protect walls from the weather, improving the comfort of the home.

Discover a ventilated facades' installation

Raised installation

A raised installation is the ideal solution for businesses that wish to pave an outdoor space.

Discover a raised installation

Installation on gravel

Installation on gravel is an ideal solution for gardens, especially where substrate drainage is a problem.

Discover an installation on gravel

Installation on sub-floor

A glued installation on a sub-floor in combination with the X2 surfaces creates stable and resistant flooring in areas that require high technical performance

Discover an installation on sub-floor

Trim pieces Italon X2

Having a great material for your floors may be not enough when you have realize your ideas to reality. For this reason Italon X2 offers you a wide range of special products for the design of public and residential spaces, swimming pools and green areas.
Download a PDF of trim pieces that complete Italon X2.

PDF TRIM PIECES